Week of 05/12

JC

  1. delivering Remedy to Hyannis

    ******************************************************************************************************************

Dan

  1. Copperline

    1. Install new masthead wind wand with Ryan

    2. Test all running lights and any other electronics report back

    3. Water test for leaks that might provide clue to galley floor water

    4. Move boat to LCYC with Ryan - car drop first thing as Ryan comes by

  2. Morse, Install mast collar use Ryan for help as needed

  3. Conroy through hull installation

  4. VanWees

    1. Review engine hose - raw water intake hose leaking at fitting above engine dripping onto starter area… most likely replace to stop water intrusion.

    2. Flush water and review water heater install. Should probably have bypass installed (not critical right now but on the radar).

    3. Hull wear area at leading edge of rudder needs to be prepped and barrier coated - Interprotect 2000 in the trailer

*******************************************************************************************************************

Ryan

  1. Drop car at LCYC - coordinate with dan

  2. Help Dan wrap Copperline

  3. Help Dan with Morse

  4. Help Dan with Conroy through hull installation

Rebecca

  1. List as directed

*******************************************************************************************************************